Available for freelance projects

Hi, I'm Prabin Adhikari

Software Engineer from Nepal

>

Full-stack engineer with 3+ years of experience building and shipping web and mobile products, from e-commerce stores and booking sites to AI-powered apps.

Prabin
Web appsSecurityDatabasesMobile appsAI & MLAPI & Integrations

Selected work

Products I've built and shipped

Ilam Durbar Tea home page

01/E-commerce · Web

Ilam Durbar Tea

A live online store for a Himalayan tea brand, built as a reusable commerce engine.

  • Product catalogue with categories and search
  • Cart and customer accounts
  • Separate admin panel and customer storefront
  • Transactional email (order confirmation and status updates) through Resend
  • Product images stored and optimised through Cloudinary
Next.js (App Router), ReactReactPostgreSQL + Prisma ORMCloudinaryVercelResendNextAuth with Google OAuth
Visit live site
WisdomPath home screenWisdomPath AI chat discussing a quoteWisdomPath daily progress chart

02/AI personal growth · Mobile App

WisdomPath

A Flutter app that turns ideas from books into daily habits, with an AI companion to talk them through.

  • AI assistant with back-and-forth conversation, grounded with RAG
  • Habit library built from book ideas, with XP, streaks and achievements
  • Progress data stays on the device
  • Conversation modes: wisdom chat on quotes, moral-dilemma scenarios, astrology, future-self and therapy-style reflection
  • Daily wisdom quotes, nudges and a personality profile that shapes suggestions
  • Three reading themes (reading/sepia, dark, light), each with a continuous tone slider
Flutter, DartProvider, GetX (theme and navigation)Cloud Firestore-Firebase AuthLLM integration, Express serverRAG, OpenRouter (fallback)SharedPreferences
FeetNine footwear store home page

03/E-commerce · Web

FeetNine

A live footwear store for Nepal with a full shopping flow from browsing to order tracking.

  • Product variants: colours with their own images, EU sizes with per-size stock
  • Catalogue with search and filters for men, women and sale, plus category, brand, price and sort
  • Cart with real-time stock checks and reserved stock during checkout
  • Wishlist, saved addresses and profile management
  • Order tracking with a visual status timeline
  • Verified reviews: only customers with a delivered order for the product can review
Next.js, ReactReact Server Components, Server ActionsPostgreSQL on Neon, Prisma ORMVercelPostHog, SentryCloudinaryTailwind CSS 4, shadcn/uiKhalti, eSewa
Visit live site
Happy Hill Resort home page

04/Hospitality · Web

Resort- Hotel Booking website

A live booking site for a hillside resort in Kathmandu, built to be reused for other properties.

  • Room booking with live availability checks that block double-booking the same room on overlapping dates.
  • eSewa payments confirmed only after the signed callback is verified, with prices always calculated on the server.
  • Promo codes as a percentage or fixed amount, with expiry dates and usage limits checked on the server.
  • Automatic confirmation and cancellation emails via Resend; guests can self-cancel with their booking reference and email.
  • Admin panel for rooms, gallery, news, notices, FAQ, reviews and inquiries, plus a dashboard for revenue and occupancy.
  • One config file rebrands the site for each resort, so a new client goes live in under 2 hours with rate limiting and Zod checks built in.
Next.js 14PostgreSQL (Neon)PrismaTailwind + shadcn/uiNextAuth.jsResend + React EmailCloudinaryeSewa
Visit live site
“

Simple things should be simple, complex things should be possible.

Alan Kay

05/Design tool · Web

QuoteCraft Studio

A browser-based editor for making quote graphics for social media in a few clicks.

  • Size presets for Instagram and X posts
  • Background photos and quotes pulled in through the Unsplash and quote APIs
  • Custom fonts, colours and image export
Next.jsTypeScriptCanvas APIUnsplash API
Try it

Experience

Full-stack engineering, backed by AI, network and security experience

  1. 2025 – Present

    Full-Stack Developer

    Tejas Byte Technologies · Freelance

    I take client products from the first call to a live deployment, on web and mobile.

    • Full-stack delivery: E-commerce and booking sites built in Next.js, from requirement gathering to deployment.
    • AI in a real product: Built and launched a Flutter and Firebase mobile app with a conversational AI assistant backed by RAG, owning it end to end.
    • Payments and data: Secure Stripe payments and database access tuned for e-commerce traffic.
    Next.jsNode.jsFlutterFirebaseMongoDBPostgreSQLRAGStripe
  2. Sep 2023 – Mar 2025

    Junior IT Assistant

    Himalayan Laghubitta Bittiya Sanstha Ltd., Kathmandu

    I kept a financial institution's servers, network and data secure and available.

    • Infrastructure and network: Ran VMware, Active Directory, application, antivirus and NAS servers behind the core banking software.
    • Security: Managed SQL database security, system-wide data risk assessments and IT compliance documentation.
    • App testing with vendors: Main technical contact for the company mobile app, resolving deployment and performance issues with external vendors.
    VMwareActive DirectoryFortinet firewallsSQL securityRisk assessment
  3. Mar 2022 – Sep 2023

    Technical SEO & Frontend Engineer

    Bikas Soft Technology, Kathmandu

    I built fast Next.js sites and made sure they get found.

    • Performance: Next.js applications with semantic markup, improving site speed and Core Web Vitals.
    • SEO and content: Led SEO strategy and managed complex WordPress sites and content pipelines.
    • Link building: Target-driven off-page SEO and backlink campaigns.
    Next.jsCore Web VitalsTechnical SEOWordPress

About

One engineer for the interface, the API and the infrastructure

I'm a full-stack software engineer who designs, builds and deploys web and mobile applications. My recent work includes online stores for tea and footwear, a resort booking site, and a mobile app with an AI companion.

Before freelancing I kept core banking infrastructure running and worked on technical SEO, so I think about security, uptime and performance as well as the interface.

Bachelor of Computer Science & IT (BCS)

Sunway International Business School

Graduated 2025

Key strengths & skills

Technical architecture

Next.jsReactNode.jsTypeScriptFlutterTailwind CSSREST API designMongoDBPostgreSQL (Neon)

AI engineering

LLM integrationRAG pipelinesConversational AI assistantsAI security assessment

Project management & workflow

SDLCAgile methodologyRequirement gatheringVendor communicationTechnical documentationVercelGit CI/CD

Systems & security

VMwareActive DirectoryFortinet firewallsSQL security managementData risk assessment

Contact

Have a project in mind? Tell me about it.

Send a short note about what you need and your timeline, and I'll reply with how I can help.

Your details are only used to reply to you.

Email

prabinadhikari.np@gmail.com